Project Gallery
Harbor Bridge (New)
Somerset provided the design of derrick cranes for the new cable-stayed Harbor Bridge.
ALRT Bridge
Somerset’s review of the erection scheme mid construction led to reduced time and labor costs for this cable-stayed bridge.
Alex Fraser Bridge
The erection of the cable-stayed Alex Fraser Bridge was planned by Somerset using a balanced cantilever method and used purpose built erection equipment also designed by Somerset.