Location: Ioco, BC Contract Value:

Somerset carried out the on-site construction engineering for this key shut-down operation at Imperial Oil, involving the major replacement of the catalytic regenerator head. Due to limited access, we specified a 275-tonne capacity ringer crane. The design of all temporary structures, rigging and crane layouts was also provided by Somerset.

 
Previous
Previous

Pan-Pacific Hotel and Convention Centre

Next
Next

Dry Gulch Bridge