Dry Gulch Bridge

Location: Dry Gulch, BC Contract Value:

This steel arch bridge was built in the mid-eighties using a cableway that is presently owned by our parent company, KWH Constructors Ltd. The cableway spans 305-metre with a capacity of 40 tonnes. It can luff either side of bridge centre line by as much as 10 metres.

 
Previous
Previous

Imperial Oil Refinery

Next
Next

Dockside Container Cranes