Baldwin Bridge
Location: Old Saybrook, CT Contract Value:
This precast segmental bridge was built using an overhead launching gantry. During the casting phase Somerset designed a 30-metre lightweight cable stayed spreader bar to lift the rebar cages into the forms. After the bridge was built, Somerset designed a finishing bridge that telescoped open in order to pass by the supporting piers.